PROJECTS

Our team of professionals have completed many projects both locally and abroad. Here is a small listing of some of the projects our team has completed.

“Experience and skill is built on the collective knowledge base of our team.”

DOMESTIC PROJECTS

Subsea Project 

Gulf of Mexico, September 2019 

Turnkey design, manufacture, install and provide services to install corrosion monitoring system on an offshore platform riser.

Hot Tap & Setting of Pig Bars

West Texas 

• 8” x 8” hot tap and setting of pig bars – October 2018
• 8” x 12” hot tap and setting of pig bars – October 2018
• 16” x 10” hot tap and setting of pig bars – October 2018

 

Subsea Hot Tap

Gulf of Mexico 

14” x 6” Class 900 subsea hot tap – September 2019 completion

Subsea Hot Tap

Gulf of Mexico

6” x 6” Class 900 subsea hot tap – September 2019 completion

Natural Gas Hot Tap

Midland Texas

24” x 24” natural gas hot tapping in Midland Texas

Natural Gas Hot Tap

Midland Texas

24” x 8’ natural gas hot tapping in Midland Texas

INTERNATIONAL PROJECTS

Mozambique Pipe Relocation Project

Mozambique 

Hot tapping & line stop services to replace 4 x 10″ NB main line pipeline valves

Mozambique Liquid Fuel Pipeline

Mozambique

• Hot tapping and line stop services to tie in 7 pipe replacement sections into existing fuel pipeline.
• Pigging services to transfer fuel from the abandoned sections to the new pipeline sections

Kendal Power Station

South Africa

Hot tapping & line stop service using an inflatable Petersen bag system to a 36″ ND water water pipeline
at major power station to allow for tie-in activities without service interruption and without requirement
to decommission steam boiler. 

Images courtesy of Eskom.

Palmiet Pump Station

South Africa 

Various hot taps on water transmission mains to affect tie-ins ranging from 30″ – 43″ diameter.


30″ Piggability Project

South Africa

Installation of 30″ launcher & receiver facilities on 3 sites. Hot tapping and line stop to install
launcher and receiver facilities without pipeline shutdown.

Olifantsfontein Gas Pipeline

South Africa 

Construct 3,500 m x 6″ HP gas pipeline, HDD to install pipeline underneath major motorway & five
position line stop operation within deviation zone.